|
|
|
| Projects in Planning | |
Project Manager: Dave Church,
281-2602, dchurch@spu.edu
3rd and Dravus
Classroom Building
Project Manager: Dave Church,
281-2602, dchurch@spu.edu
Project Manager: Dave Church,
281-2602, dchurch@spu.edu
Construction Timeline: To be determined
Architect: The Miller Hull Partnership
Contractor: To be Determined
Construction Timeline: To be determined
Preliminary Design Architect: LMN Architects
Contractor: To be Determined
Design PowerPoint: Download (6 mb) |
View (opens in a new window, optimized for IE)
Design video (alley): Download (14 mb)
Design video (street front): Download (48 mb)
Copyright © 2008 Seattle Pacific University.
General Information: (206) 281-2000